Main content
				
				
		
			
Top content
		
	
			
				Publications
Journals
 
- J.-N. Buckow, M. Goerigk, S. Knust (2025): Integrated pallet retrieval and processing in warehouses under uncertainty
 OR SpectrumDOI:10.1007/s00291-024-00806-7 
- J.-N. Buckow, M. Goerigk, S. Knust (2024): Retrieval optimization in a warehouse with multiple input/output-points
 OR SpectrumDOI:10.1007/s00291-024-00775-x 
- T. Brandt, C. Büsing, S. Knust (2024): Structural insights about avoiding transfers in the patient-to-room assignment problem
Discrete Applied Mathematics 347, 231–248. DOI:10.1016/j.dam.2023.12.025 
- J.-N. Buckow, S. Knust (2023): The warehouse reshuffling problem with swap moves and time limit
EURO Journal on Transportation and Logistics 12, 100113. DOI:10.1016/j.ejtl.2023.100113 
- S. Boge, S. Knust (2023): The blocks relocation problem with item families minimizing the number of reshuffles
 OR Spectrum 45, 395-435. DOI:10.1007/s00291-022-00703-x 
- J.-N. Buckow, S. Knust (2023): The warehouse reshuffling problem with swap moves
Transportation Research Part E: Logistics and Transportation Review 169, 102994. DOI:10.1016/j.tre.2022.102994 
- T. Brandt, C. Büsing, S. Knust (2022): One transfer per patient suffices: Structural insights about patient-to-room assignment
Lecture Notes of Computer Science 13526, 245-259. DOI:10.1007/978-3-031-18530-4_18 
- S. Knust, X.T. Le, N.T. Nga (2022): The gain of robustness for a storage loading problem
Vietnam Journal of Mathematics 50, 1-27. DOI:10.1007/s10013-020-00425-z 
- T. Oelschlägel, S. Knust (2021): Solution approaches for storage loading problems with stacking constraints
Computers and Operations Research 127, 105142. DOI:10.1016/j.cor.2020.105142 
- J.-N. Buckow, B. Graf, S. Knust (2020): The exponential multi-insertion neighborhood for the vehicle routing problem with unit demands
Computers and Operations Research 120, 104949. DOI:10.1016/j.cor.2020.104949 
- S. Boge, M. Goerigk, S. Knust (2020): Robust optimization for premarshalling with uncertain priority classes
European Journal of Operational Research 287, 191-210. DOI:10.1016/j.ejor.2020.04.049 
- S. Boge, S. Knust (2020): The parallel stack loading problem minimizing the number of reshuffles in the retrieval stage
European Journal of Operational Research 280, 940-952. DOI:10.1016/j.ejor.2019.08.005 
- D. Meignan, S. Knust (2019): A neutrality-based iterated local search for shift scheduling optimization and interactive reoptimization
European Journal of Operational Research 279, 320-334. DOI:10.1016/ejor.2019.06.005  
- S. Knust, N.V. Shakhlevich, S. Waldherr, C. Weiß (2019): Shop scheduling problems with pliable jobs 
Journal of Scheduling 22, 635-661. DOI: 10.1007/s10951-019-00607-9 
- M. Bultmann, S. Knust, S. Waldherr (2018): Synchronous flow shop scheduling with pliable jobs 
European Journal of Operational Research 270, 943-956. DOI:10.1016/j.ejor.2018.04.024  
- M. Bultmann, S. Knust, S. Waldherr (2018): Flow shop scheduling with flexible processing times
OR Spectrum 40, 809-829. DOI:10.1007/s00291-018-0520-8 
- C. Büsing, S. Knust, X.T. Le (2018): Trade-off between robustness and cost for a storage loading problem: rule-based scenario generation
EURO Journal on Computational Optimization 6, 339-365. DOI:10.1007/s13675-018-0094-x 
- S. Waldherr, S. Knust, D. Briskorn (2017): Synchronous flow shop problems: How much can we gain by leaving machines idle?
 Omega 72, 15-24.  DOI:10.1016/j.omega.2016.10.006 
- S. Waldherr, S. Knust (2017): Decomposition algorithms for synchronous flow shop problems with additional resources and setup times 
European Journal of Operational Research 259, 847–863.  DOI:10.1016/j.ejor.2016.11.015  
- X.T. Le, S. Knust (2017): MIP-based approaches for robust storage loading problems with stacking constraints
Computers and Operations Research 78, 138-153. DOI:10.1016/j.cor.2016.08.016 
- C. Weiß, S. Waldherr, S. Knust, N.V. Shakhlevich (2017): Open shop scheduling with synchronization 
Journal of Scheduling 20, 557-581.  DOI:10.1007/s10951-016-0490-0 
- C. Weiß, S. Knust, N.V. Shakhlevich, S. Waldherr (2016): The assignment problem with nearly Monge arrays and incompatible partner indices
Discrete Applied Mathematics 211, 183-203.  DOI:10.1016/j.dam.2016.04.019 
- J. Poppenborg, S. Knust (2016):  Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers
EURO Journal on Computational Optimization 4, 349-380. DOI:10.1007/s13675-015-0061-8 
- M. Kampmeyer, S. Knust, S. Waldherr (2016):  Solution algorithms for synchronous flow shop problems with two dominating machines
Computers and Operations Research 74, 42-52.  DOI:10.1016/j.cor.2016.04.010 
- M. Goerigk, S. Knust, X.T. Le (2016):  Robust storage loading problems with stacking and payload constraints 
European Journal of Operational Research 253, 51-67. DOI:10.1016/j.ejor.2016.02.019 
- J. Poppenborg, S. Knust (2016): A flow-based tabu search algorithm for the RCPSP with transfer times 
OR Spectrum 38, 305-334  DOI:10.1007/s00291-015-0402-2 
- F. Bruns, S. Knust, N.V. Shakhlevich (2016):  Complexity results for storage loading problems with stacking constraints
European Journal of Operational Research 249, 1074-1081.  DOI:10.1016/j.ejor.2015.09.036 
- D. Meignan, S. Knust, J.-M. Frayret, G. Pesant, N. Gaud (2015): A review and taxonomy of interactive optimization methods in operations research
ACM Transactions on Interactive Intelligent Systems 5.  DOI:10.1145/2808234 
- S. Waldherr, S. Knust, S. Aust (2015): Message scheduling for real-time interprocessor communication
 Journal of Systems Architecture 61, 374-382.  DOI:10.1016/j.sysarc.2015.06.002 
- S. Waldherr, J. Poppenborg, S. Knust (2015):  The bottleneck transportation problem with auxiliary resources
4OR - A Quarterly Journal of Operations Research 13, 279-292.  DOI:10.1007/s10288-015-0284-9 
- S. Waldherr, S. Knust (2015):  Complexity results for flow shop problems with synchronous movement
European Journal of Operational Research 242, 34-44.  DOI:10.1016/j.ejor.2014.09.053 
-  M. Paul, S. Knust (2015):  A classification scheme for integrated staff rostering and scheduling problems
RAIRO Operations Research 49, 393-412.  DOI:10.1051/ro/2014052 
- J. Lehnfeld, S. Knust (2014):  Loading, unloading and premarshalling of stacks in storage areas: Survey and classification
 European Journal of Operational Research 239, 297–312.   DOI:10.1016/j.ejor.2014.03.011  
-  F. Bruns, M. Goerigk, S. Knust, A. Schöbel (2014):  Robust load planning of trains in intermodal transportation 
 OR Spectrum 36, 631-668.   DOI:10.1007/s00291-013-0341-8  
-  S. Waldherr, S. Knust (2014):  Two-stage scheduling in shelf-board production: A case study
 International Journal of Production Research 52, 4078-4092.   DOI:10.1080/00207543.2013.809495  
-  C. Viergutz, S. Knust (2014):  Integrated production and distribution scheduling with lifespan constraints
 Annals of Operations Research 213, 293-318.   DOI:10.1007/s10479-012-1197-z   Data  
-  C. Artigues, P. Brucker, S. Knust, O. Kone, P. Lopez, M. Mongeau (2013):  A note on ``Event-based MILP models for resource-constrained project scheduling problems''
 Computers and Operations Research 40, 1060-1063. DOI:10.1016/j.cor.2012.10.018  
-  A. Condotta, S. Knust, D. Meier, N.V. Shakhlevich (2013):  Tabu search and lower bounds for a combined production-transportation problem
 Computers and Operations Research 40, 886-900. DOI:10.1016/j.cor.2012.08.017  
-  J. Poppenborg, S. Knust, J. Hertzberg (2012):  Online scheduling of flexible job-shops with blocking and transportation
 European Journal of Industrial Engineering 6, 497-518.   DOI:10.1504/EJIE.2012.047662   Data  
-  A. Condotta, S. Knust, N.V. Shakhlevich (2010):  Parallel batch scheduling of equal-length jobs with release and due dates
 Journal of Scheduling 13, 463-477.   DOI:10.1007/s10951-010-0176-y  
-  S. Knust (2010): Scheduling non-professional table-tennis leagues
 European Journal of Operational Research 200, 358-367.   DOI:10.1016/j.ejor.2009.01.015  
-  G. Kendall, S. Knust, C.C. Ribeiro, S. Urrutia (2010): Scheduling in sports: An annotated bibliography
 Computers and Operations Research 37, 1-19.   DOI:10.1016/j.cor.2009.05.013  
-  D. Briskorn, S. Knust (2010): Constructing fair sports league schedules with regard to strength groups
 Discrete Applied Mathematics 158, 123-135.   DOI:10.1016/j.dam.2009.08.006  
-  S. Knust, D. Lücking (2009):  Minimizing costs in round robin tournaments with place constraints
 Computers and Operations Research 36, 2937-2943.   DOI:10.1016/j.cor.2009.01.004  
-  P. Brucker, S. Knust, C. Oguz (2006):  Scheduling chains with identical jobs and constant delays on a single machine
 Mathematical Methods of Operations Research 63, 63-75.   DOI:10.1007/s00186-005-0014-8  
-  P. Brucker, S. Knust, G. Wang (2005):  Complexity results for flow-shop problems with a single server
 European Journal of Operational Research 165, 398-407.   DOI:10.1016/j.ejor.2004.04.010  
-  J. Hurink, S. Knust (2005):  Tabu search algorithms for job-shop problems with a single transport robot
 European Journal of Operational Research 162, 99-111.   DOI:10.1016/j.ejor.2003.10.034   Data  
-  P. Brucker, T.C.E. Cheng, S. Knust, N.V. Shakhlevich (2004):  Complexity results for flow-shop and open-shop scheduling problems with transportation delays 
 Annals of Operations Research 129, 81-106.   DOI:10.1023/B:ANOR.0000030683.64615.c8  
-  P. Baptiste, P. Brucker, S. Knust, V.G. Timkovskyu (2004):  Ten notes on equal-processing-time scheduling 
 Quarterly Journal of the Belgian, French and Italian Operations Research Societies (4OR) 2, 111-127.   DOI:10.1007/s10288-003-0024-4  
-  P. Brucker, J. Hurink, S. Knust (2002):  A polynomial algorithm for P | pj=1, rj, outtree | sum Cj 
 Mathematical Methods of Operations Research 56, 407-412.   DOI:10.1007/s001860200228  
-  P. Brucker, S. Knust (2002):  Lower bounds for scheduling a single robot in a job-shop environment 
 Annals of Operations Research 115, 147-172.   DOI:10.1023/A:1021149204501   Data  
-  P. Brucker, S. Heitmann, S. Knust (2002):  Scheduling railway traffic at a construction site 
 OR Spectrum 24, 19-30.   DOI:10.1007/s291-002-8198-0  
-  P. Brucker, C. Dhaenens-Flipo, S. Knust, S.A. Kravchenko, F. Werner (2002): Complexity results for parallel machine problems with a single server 
 Journal of Scheduling 5, 429-457.   DOI:10.1002/jos.120  
-  J. Hurink, S. Knust (2002):  A tabu search algorithm for scheduling a single robot in a job-shop environment 
 Discrete Applied Mathematics 119, 181-203.   DOI:10.1016/S0166-218X(01)00273-6   Data  
-  J. Hurink, S. Knust (2001):  Makespan minimization for flow-shop problems with transportation times and a single robot 
 Discrete Applied Mathematics 112, 199-216.   DOI:10.1016/S0166-218X(00)00316-4  
-  J. Hurink, S. Knust (2001):  List scheduling in a parallel machine environment with precedence constraints and setup times 
 OR Letters 29, 231-239.   DOI:10.1016/S0167-6377(01)00104-3  
-  P. Brucker, S. Knust (2000):  A linear programming and constraint propagation-based lower bound for the RCPSP 
 European Journal of Operational Research 127, 355-362.   DOI:10.1016/S0377-2217(99)00489-0  
-  P. Brucker, S. Knust, D. Roper, Y. Zinder (2000):  Scheduling UET task systems with concurrency on two parallel identical processors 
 Mathematical Methods of Operations Research 52, 369-387.   DOI:10.1007/s001860000089  
-  P. Brucker, S. Knust (1999):  Complexity results for single-machine problems with positive finish-start time-lags 
 Computing 63, 299-316.   DOI:10.1007/s006070050036  
-  P. Brucker, S. Knust, A. Schoo, O. Thiele (1998):  A branch and bound algorithm for the resource-constrained project scheduling problem 
 European Journal of Operational Research 107, 272-288.   DOI:10.1016/S0377-2217(97)00335-4 
 
 
 
Books and book chapters
-  P. Brucker, S. Knust (2006):  Complex Scheduling,  Springer, ISBN 978-3-540-29545-7.  Web site
 
-  S. Knust (2015):  Lower bounds on the minimum project duration
 in: C. Schwindt, J. Zimmermann (eds.): Handbook on Project Management and Scheduling, Vol.1, International Handbooks on Information Systems, Springer, 43-55.   DOI 10.1007/978-3-319-05443-8_3 
-  S. Knust (2011):  Scheduling of tournaments or sports leagues
 in: B. Vöcking, H. Alt, M. Dietzfelbinger, R. Reischuk, C. Scheideler, H. Vollmer, D. Wagner (eds.): Algorithms Unplugged,  Springer, 267-275.    DOI:10.1007/978-3-642-15328-0_27 
-  S. Knust (2011):  "Diskret" optimierte Pläne im Alltag 
 in: K. Wendland, A. Werner (eds.): Facettenreiche Mathematik - Einblicke in die moderne mathematische Forschung,  Vieweg+Teubner, 257-272.  
-  P. Brucker, S. Knust (2009):  On the complexity of scheduling
 in: Y. Robert, F. Vivien (eds.): Introduction to Scheduling, Chapman and Hall/CRC Press. CRC Press, 1-21.  
-  S. Knust (2008):  Turnier- und Sportligaplanung
 in: B. Vöcking, H. Alt, M. Dietzfelbinger, R. Reischuk, C. Scheideler, 	H. Vollmer, D. Wagner (eds.): 	Taschenbuch der Algorithmen,  Springer, 275-284.  
-  P. Brucker, S. Knust (2000):  Scheduling 
 in Theme 6.5. Optimization and Operations Research, edited by U. Derigs, in Encyclopedia of Life Support Systems (EOLSS) developed under the auspices of the UNESCO, Eolss Publishers, Oxford, UK.  
-  P. Brucker, S. Heitmann, S. Knust (2004):  Scheduling railway traffic at a construction site 
 in: H.-O. Günther, K.H. Kim (eds.): Container Terminals and Automated Transport Systems Logistics Control Issues and Quantitative Decision Support,  Springer.  
-  P. Brucker, S. Knust (2001):  Resource-constrained project scheduling and timetabling 
 in: E.Burke, W.Erben (ed.): The Practice and Theory of Automated Timetabling III, Springer Lecture Notes in Computer Science Vol. 2079, 277-293.  
-  T. Baar, P. Brucker, S. Knust (1998):  Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem 
 in: S.Voss, S.Martello, I.Osman, C.Roucairol (eds.): Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimization, Kluwer, 1-18.   Results  
-  P. Brucker, S. Knust (1998):  Solving large-sized resource-constrained project scheduling problems 
 in: J.Weglarz (ed.): Project Scheduling: Recent Models, Algorithms and Applications, Kluwer, 27-51.  
 
Miscellaneous